How much does 25 kW of colocation cost in Dallas in 2026?
Modeled 2026 25 kW / 5-cabinet Tier-2 hub pricing runs roughly $6,200 to $11,400/month ($225,000 to $415,000 over 36 months) including 6 cross-connects.
As of November 2026, VendorParity deterministic infrastructure modeling for 25 kW (5 cabinets, 6 cross-connects, 36-month term) places 36-month colocation cost between $263,765 (Flexential) and $471,264 (Equinix IBX), a $207,499 spread before dedicated 10GBPS DIA or SASE network circuits.
Key facts
2026 Desk SummaryVendorParity's 25 kW Dallas Colo benchmark normalizes all vendors across identical 2026 workload parameters: 5-cabinet, 25 kW private cage deployment (6 cross-connects, 10 Gbps on-net fiber DIA, 36-month term) in a power-advantaged Tier-2 hub like Dallas-Fort Worth (Texas EIA ~8.5-9.0 cents/kWh).
| Colocation Operator | Pricing Model | Power + Space / Mo | Cross-Connects / Mo | Install NRC | 36-Mo Total | Eff. / kW / Mo |
|---|---|---|---|---|---|---|
| Equinix IBX | Cabinet + Power + Cross-Connect (Quote-Only) | $10,834 | $2,040 | $7,800 | $471,264 | $515 |
| Digital Realty | Per-kW Retail / Cage + Cross-Connect (Quote-Only) | $7,497 | $1,710 | $6,630 | $338,082 | $368 |
| CoreSite | Per-kW + Cloud On-Ramp Ecosystem (Quote-Only) | $6,909 | $1,740 | $6,110 | $317,474 | $346 |
| Flexential | Per-kW Mid-Market / Hybrid Colo (Quote-Only) | $5,875 | $1,320 | $4,745 | $263,765 | $288 |
| Network / SASE Provider | Category | Monthly MRC | Install NRC | Annualized | 36-Mo Total |
|---|---|---|---|---|---|
| Lumen Dedicated Internet Access (DIA) | Dedicated Fiber DIA | $2,898 | $0 | $34,776 | $104,328 |
| Zayo Dedicated Fiber (DIA) | Dedicated Fiber DIA | $2,803 | $0 | $33,636 | $100,908 |
| Cato Networks Unified SASE | Unified SASE | $943 | $450 | $11,466 | $34,398 |
VendorParity isolates 3 primary commercial drivers that explain why 25 kW Dallas Colo actual invoices diverge 20% to 45% from initial vendor sticker quotes in 2026.
CFOs and IT leaders signing a 25 kW Dallas Colo order form must execute 3 written commercial redlines before countersigning to block hidden overages and evergreen lock-ins.
Modeled 2026 25 kW / 5-cabinet Tier-2 hub pricing runs roughly $6,200 to $11,400/month ($225,000 to $415,000 over 36 months) including 6 cross-connects.
U.S. EIA 2026 data shows Texas commercial electricity averaging ~8.5-9.0 cents/kWh versus ~30.0-30.6 cents/kWh in California, directly reducing power pass-throughs.
Production cloud-hybrid cages typically pair dual 1G or 10G diverse carrier handoffs (e.g., Lumen + Zayo) for BGP failover.
Primary verification sources on this page require at least 2 official vendor rate cards, federal CFR filings, or public statistical benchmarks; modeled figures remain explicitly labeled as VendorParity planning estimates.
VendorParity structures apples-to-apples 36-month TCO bids with written overage caps and zero vendor sales spam.