How much does Phoenix colocation cost in 2026?
Phoenix retail colocation ranges from $180 to $275/kW/month in 2026, with wholesale deployments near $140 to $195/kW/month.
As of November 2026, Phoenix / Mesa / Chandler retail colocation runs $180 to $275 / kW / mo ($1,500 to $2,450 / cab / mo) and wholesale >1 MW space averages $140 to $195 / kW / mo, underpinned by Arizona commercial electricity rates of 12.02 to 13.12 cents/kWh (U.S. EIA Table 5.6.A). Cross-connects add $200 to $325 / mo per circuit, while on-net 10 Gbps dedicated fiber DIA ranges from $2,400 to $3,800 / mo.
Key facts
2026 Desk SummaryVendorParity's 2026 Phoenix / Mesa / Chandler rate ledger isolates all 6 recurring infrastructure cost lines because 0 of 10 major U.S. colocation operators publish static unit pricing publicly.
| Infrastructure Cost Line | Phoenix / Mesa / Chandler 2026 Benchmark | Commercial Note |
|---|---|---|
| Retail Cage / Cabinet Power (<250 kW) | $180 to $275 / kW / mo | 36-to-60 month term; excludes cross-connect MRC |
| Wholesale Turnkey (>1 MW) | $140 to $195 / kW / mo | Base rent plus metered utility power x PUE |
| Standard Full Cabinet (4-6 kW) | $1,500 to $2,450 / cab / mo | Includes space + baseline redundant A/B circuits |
| Single-Mode Fiber Cross-Connect | $200 to $325 / mo | Recurring monthly fee per carrier/cloud handoff |
| On-Net 1 Gbps / 10 Gbps Fiber DIA | $800 to $1,250 / mo / $2,400 to $3,800 / mo | Off-net last-mile loops add 35% to 65% MRC |
| Arizona Commercial Power (U.S. EIA) | 12.02 to 13.12 cents/kWh | U.S. EIA Electric Power Monthly Table 5.6.A (2026) |
Phoenix / Mesa / Chandler sits in VendorParity's Tier-2 Power Hub tier with Arizona commercial power averaging 12.02 to 13.12 cents/kWh across operators including Iron Mountain (AZP-1/2), Digital Realty (Phoenix), QTS (Phoenix), Flexential, CyrusOne, PhoenixNAP, EdgeCore.
Enterprise buyers negotiating 36-to-60 month Phoenix / Mesa / Chandler data center leases cut recurring rent and cross-connect spend 18% to 35% by executing 3 local sourcing tactics before signing.
Phoenix retail colocation ranges from $180 to $275/kW/month in 2026, with wholesale deployments near $140 to $195/kW/month.
Arizona commercial power (~12.0-13.1 cents/kWh per U.S. EIA) costs less than half of California rates (~30+ cents/kWh), alongside native Azure West US 3 presence and low seismic risk.
Modern Mesa and Chandler campuses use closed-loop evaporative/chilled-water cooling designed for desert climates; always verify contractual PUE caps in writing.
Primary verification sources on this page require at least 2 official vendor rate cards, federal CFR filings, or public statistical benchmarks; modeled figures remain explicitly labeled as VendorParity planning estimates.
VendorParity compares Phoenix / Mesa / Chandler cages, cabinets, cross-connects, and on-net 1G/10G DIA across multiple operators on one 36-month ledger.